How much is a square of Foshan Epoxy Terrazzo?

With the constant popularity of people's living standards, it has been promoted and applied outside the home decoration. Floor paint has become one of the fastest growing industries in China, causing the world's meticulous. Whether it is like a cement product to achieve factory-based production, the prospect is even more! It is used in various fields, such as factory buildings, machine rooms, stacks, laboratories, wards, operating rooms, workshops, etc. Interpretation of epoxy resin floor paint seal curing floor wear-resistant floor data construction:

First, construction site request:

1, structural concrete must have C20 strength, flat contour There is no sign of sanding, the curing period reaches 28 places after pouring, and the contour flatness is required to measure 2m by ≤3mm.

2. The concrete floor moisture content is less than 8%, the ambient humidity is less than 80%, the construction temperature is 20-25 °C, and the construction temperature is lower than 5 °C.

3, the first layer of concrete construction layer of the construction plant needs to be treated as moisture-proof, to stop the influence of the first layer of epoxy floor water and gas, and produce signs of foaming and delamination.

Two, epoxy floor before the construction request:

1, before the construction, according to the construction area to calculate the amount of data, organize construction materials, in accordance with the construction area, route, bias to select the ingredients.

2, the area of the ingredients is first padded with a piece of plastic cloth, and then a layer of cardboard is displayed to avoid data leakage and purification of the base surface.

3. Prepare the ingredients for the ingredients.

Third, the construction site:

The construction site set up the head of the project, the craftsman, the safety supervisor, and set up the facility team according to the construction request. Construction staff must comply with on-site rules and regulations.

IV. Data Storage:

All admission documents are subject to different types of documents, and are reserved for special personnel. Whether the subcontractor conducts sampling inspection and data, and the strict external certificate plan The amount of materials used for construction.

V. Construction Ingredients:

The construction materials are prepared by special personnel, and the materials are requested with strict rigorous information. The ingredients area is exposed by plastic mats to avoid data purification. Waste or the remaining dross is sent to the required area for disposal.

VI. Cleanliness request in the construction area:

The construction area should be sealed and the entry of unrelated staff should be stopped. The ambience cleanliness fits the usual cleaning request.

With the constant popularity of people's living standards, it has been promoted and applied outside the home decoration. Floor paint has become one of the fastest growing industries in China, causing the world's meticulous. Whether it is like a cement product to achieve factory-based production, the prospect is even more! It is used in various fields, such as factory buildings, machine rooms, stacks, laboratories, wards, operating rooms, workshops, etc. Interpretation of epoxy resin floor paint seal curing floor wear-resistant floor data construction:

First, construction site request:

1, structural concrete must have C20 strength, flat contour There is no sign of sanding, the curing period reaches 28 places after pouring, and the contour flatness is required to measure 2m by ≤3mm.

2. The concrete floor moisture content is less than 8%, the ambient humidity is less than 80%, the construction temperature is 20-25 °C, and the construction temperature is lower than 5 °C.

3, the first layer of concrete construction layer of the construction plant needs to be treated as moisture-proof, to stop the influence of the first layer of epoxy floor water and gas, and produce signs of foaming and delamination.

Two, epoxy floor before the construction request:

1, before the construction, according to the construction area to calculate the amount of data, organize construction materials, in accordance with the construction area, route, bias to select the ingredients.

2, the area of the ingredients is first padded with a piece of plastic cloth, and then a layer of cardboard is displayed to avoid data leakage and purification of the base surface.

3. Prepare the ingredients for the ingredients.

Third, the construction site:

The construction site set up the head of the project, the craftsman, the safety supervisor, and set up the facility team according to the construction request. Construction staff must comply with on-site rules and regulations.

IV. Data Storage:

All admission documents are subject to different types of documents, and are reserved for special personnel. Whether the subcontractor conducts sampling inspection and data, and the strict external certificate plan The amount of materials used for construction.

V. Construction Ingredients:

The construction materials are prepared by special personnel, and the materials are requested with strict rigorous information. The ingredients area is exposed by plastic mats to avoid data purification. Waste or the remaining dross is sent to the required area for disposal.

VI. Cleanliness request in the construction area:

The construction area should be sealed and the entry of unrelated staff should be stopped. The ambience cleanliness fits the usual cleaning request.

 